PROJECTS : CHAPTER 9 PUNE METRO

Image
 CHAPTER 9 PUNE METRO Project Name: Pune Metro Rail Project Owner: Maharashtra Metro Rail Corporation Limited (Maha Metro) Project Type: Mass Rapid Transit System (MRTS) Project Cost: 24,478 Cr Funding Pattern: Govt. of India, Maharashtra Govt. and Foreign Funding Institutions Completion Target: 2021 Corridor I: PCMC – Swargate Total Length: 16.589 km Total Stations: 14 (Elevated -9, Underground-5) Station Names: Pimpri Chinchwad Municipal Corporation (PCMC), Sant Tukaram Nagar, Bhosari, Kasarwadi, Fugewadi,Dapodi, Bopodi, Khadki, Range Hill, Shivajinagar, ASI, PMC, Budhwar Peth, Mandai, Swargate. Corridor II: Vanaz – Ramwadi Total Length: 14.665 km Total Stations: 16 (All Elevated) Station Names:Vanaz, Anand Nagar, Ideal Colony, Nal Stop, Garware College, Deccan Gymkhana, Sambhaji Park, PMC,Civil Court, Mangalwar Peth, Pune Railway Station, Ruby Clinic, Bund Garden, Yerawada, Kalyani Nagar, Ramwadi.   Corridor III: Hinjawadi – Shivajinagar Project Cost: Rs 8,100.00 Crore Total Length:

PROJECTS : SURAT METRO

Image
 SURAT METRO Project Name: Surat Metro Rail Project Operator: Gujarat Metro Rail Corporation Limited Owner: Govt. of India and Govt. of Gujarat Project Type: Mass Rapid Transit System (MRTS) Project Cost: INR 12,114 Crores (Phase-I) External Funding Agency: AfD and KfW Total Network Length: 40.35 km Nos. of Corridors: 2 Status: Under-construction Contract Awarded Delhi Metro Rail Corporation:   DPR Consultant. Systra MVA Consulting:   Detailed design consultancy for Corridor-1 from Dream city to Majuragate Elevated Viaduct and Nine Elevated Metro-Rail Stations including Depot at Dream city. Corridor 1 (Red Line): Sarthana to Dream City Route Length: 21.61 km Stations: 20 Stations (Elevated -15.14 km, 14 Stations), Underground -6.47 km, 6 Stations) Station Names: Sarthana, Nature Park, Varachha Chopati, Kapodra Patiya, Laabheshwar Chowk, Central Warehouse, Surat, Maskati Hospital, Chowk Bazar, Majura Gate, Rupali Canal, Althan Tenament, Althan Gam, VIP Road, Women ITI, Bhimrad, Conventi

PROJECTS: EPISODE 1 - CHENNAI METRO RAIL LIMTED

Image
 CHENNAI METRO RAIL LIMTED Project Name: Chennai Metro Rail Project Owner: Govt. of India and Govt. of Tamilnadu Operator: Chennai Metro Rail Limited (CMRL) Project Type: Mass Rapid Transit System (MRTS) Project Cost: INR 20,000 Crore (Phase-I) Total Length: 54.1 km Funding Pattern: Govt. of Tamilnadu and Foreign Institution Completion Target: 2021 Phase-II: Future Expansion – 107.59 km Phase-I: Operational – 54.1 km  Major Contractors (Phase I) Delhi Metro Rail Corporation: Consultant for Detailed Project Report (DPR) Egis Rail SA, France: General Consultancy Soma Enterprise: For the construction of a 4.5 km long viaduct along the Inner Ring Road Larsen and Toubro (L&T): For contraction for Elevated viaducts and Koyambedu depot L&T-Alstom JV: For design and construction of track works Johnson-SJEC JV: For supply of lifts and escalators Siemens AG: For the power supply and overhead electrification Alstom: For supply of Rolling Stock Nippon Signal: For Automatic Fare Collection

PROJECTS: EPISODE 3 - BANGALORE METRO RAIL CORPORATION LIMITED

Image
  BANGALORE METRO RAIL CORPORATION LIMITED Project Name:  Bangalore Metro Rail Project (Namma Metro) Operator:  Bangalore Metro Rail Corporation Limited Owner: Govt. of India and Govt. of Karnataka Project Type:  Mass Rapid Transit System (MRTS) Status: Operational - October 20, 2011 Completion Target:  2023 (Phase-II) Major Contractors Namma Metro Phase II IL&FS-ECC Ltd JV:  Construction of Elevated Viaduct from Mysore Road station dead end to Pattanagere Station including 4 Nos of Elevated Metro Stations of East-West Corridor of Phase II.  (Rs 326.99 Crore) NCC Limited:  Construction of Elevated Viaduct from Puttenahalli Cross station dead end to Anjanapura Township Station and further viaduct for Depot Lines including 5 Nos. of Elevated Metro Stations North-South Corridor of Phase II.  (Rs 508.86 Crore) Soma Enterprise Ltd:  Construction of Elevated Viaduct from Pattanagere station to the beginning of Challagatta Depot including 2 Nos. of Metro Stations viz. Mailasandra Station

PROJECTS : EPISODE 5 : PATNA METRO

Image
  PATNA METRO Project Name: Patna Metro Rail Project Owner: Patna Metro Rail Corporation Limited, Govt. of Bihar Project Type: Mass Rapid Transit System (MRTS) Project Cost: INR 13,479 Crores Network Length: 32.12 km Funding Pattern: Govt. of India (20%), Govt. of Bihar (20%) and Loan from Foreign Institutions (60%) Completion Target: 2023 Status: Under construction Contract Awarded DMRC Limited:  General Consultancy CEG Group:  Geotechnical Investigation and Soil Testing Works AECOM Singapore - AECOM India JV:  Detailed Design Consultancy  Systra MVA:  Traction Consultancy Civil Contracts Package (PC 01):  NCC Limited Package (PC 02):  Quality Buildcon Pvt. Ltd. Patna Metro Rail Network Corridor 1 (East-West): Danapur Cantonment - Khemni Chak Length: 16.86 km (Elevated- 9.36 km, Underground- 7.5 km) Total Stations: 14 (Elevated-8, Underground-6) Station Names:  Danapur Cantonment, Saguna More, RPS More, Patliputra, Rukanpura, Raja Bazar, Patna Zoo, Vikas Bhawan, Vidyut Bhawa

PROJECTS : EPISODE 8 JAIPUR METRO

Image
 JAIPUR METRO Project Name: Jaipur Metro Rail Project Operator: Jaipur Metro Rail Corporation Limited (JMRC) Owner: Govt. of Rajasthan General Consultant: Delhi Metro Rail Corporation (DMRC) Project Type:  Mass Rapid Transit System (MRTS) Project Cost:  INR 9732.00 Crore Funding Agency: Jaipur Government Start Date of Operation: 3 June 2015 Major Contract Awarded Delhi Metro Rail Corporation (DMRC):  General Consultancy BEML Limited:  Contract for the supply of 10 nos. four-car train (Rolling Stock) Jaipur Metro Rail Network Operational Network:  12.0 km  | No. of Station:  11 Phase I: Mansarovar - Badi Chaupar (North-South Corridor) Route Length: 12.0 km Project Cost: INR 3,149 crore Stations: 11 Stations No. of Trains: 10 Operational Stations: Mansarovar, New Aatish Market, Vivek Vihar, Shyam Nagar, Ram Nagar, Civil Lines, Railway Station, Sindhi Camp, Chand Pole, Chhoti Chaupar, Badi Chaupar. Depot: Mansarovar Phase II: Sitapura Industrial Area - Ambabari (East-West Corridor) R

PROJECTS : EPISODE 7 KANPUR METRO

Image
  KANPUR METRO Project Name: Kanpur Metro Rail Project Owner:  Uttar Pradesh Metro Rail Corporation Limited Project Type:  Mass Rapid Transit System (MRTS) Project Cost:  INR 11,076 Crores Funding Pattern:  Govt. of India, Govt. of Uttar Pradesh and European Investment Bank (EIB) Completion Target:  2022 Major Contractors TYPSA-Italferr JV:  General Consultancy (Rs 260.62 Crore) Systra MVA Consulting:  Detailed Design Consultant (DDC) Afcons Infrastructure Limited:  Design and construction of elevated viaducts and 9 stations of priority corridor from IIT Kanpur to Moti Jhil (Rs 735 Crore). KSM Bashir Mohammad & Sons :  Construction of Metro Depot-cum-Workshop at Government Polytechnic (Rs 83.9 Crore). Bombardier Transportation:  Supply of Rolling Stock Coaches including Signaling System. Kanpur Metro Rail Network Line-1 (Priority Corridor): IIT Kanpur - Moti Jheel Project Cost: INR 11,076 crores Length: 8.7 km Total Stations: 9 (Elevated) Station Names:  IIT Kanpur, Kalyanpur R

PROJECTS : EPISODE 6 NOIDA METRO

Image
 NOIDA METRO Project Name:  Noida Metro Rail Project Operator:  Noida Metro Rail Corporation Limited Owner:  Govt. of India and Govt. of Uttar Pradesh Project Type:  Mass Rapid Transit System (MRTS) Project Cost: INR 5,503 Crore (Phase-I) Total Planned Metro Network: 70 km Operational Network: 29.7 km (1 Line, 22 Stations) Noida Metro Rail Network (Phase I) Line 1 (Aqua Line): Noida City Centre - Depot Station Project Cost: Rs 5503 Crore Route Length: 29.707 km (Operational) Total Stations: 22 (All elevated) Station Names: Noida City Centre, Sector-71, Sector-50, Sector-78, Sector-101, Sector-81, Dadri Road, Sector-83, Sector-137, Sector-142, Sector-143, Sector-144, Sector-147, Sector-153, Sector-146, Sector-149, Knowledge Park-II, Knowledge Park-I, Pari Chowk, Alpha-I, Alpha-II, Delta-I, Depot. Interchange Stations: Noida City Centre (Delhi Metro's Blue Line) Status: Operational Noida Metro Rail Network (Phase II) Line 1 Extension (Aqua Line): Noida Sec 71 :Knowledge Park

PROJECTS : EPISODE 4 : KUWAIT METRO

Image
 KUWAIT METRO Project Name : Kuwait Mass Rapid Transit Project Owner:               Transport of Kuwait Project Cost:      USD 20 billion (Estimated) Funding Pattern: Public-Private Partnership Mode Total Planned Network: 160 km (4 lines) Operational Network: Nil Under Construction Network: Nil Deadline: 2025 Line 1 (Orange Line): [Fahaheel] - Messila Beach – Kuwait University - [Jahra] Route Length: 23.7 km Total Stations:   19 Station Names: [Fahaheel], Messila Beach, Salwa, Bayan, Mubarax Al Kabeer Hospital, Qadisiya Stadium, Shaab, Istiqlal Road, Al Bergan, Bneid Al Gar, Jaber Al Mubarak, Dasman Gate, Ahmed Al Jaber, Sharq, Great Mosque, National Museum, Al Muthana Complex, Jahra Gate, Sadeeq Al Salam Garden, Ministry of Communications, University, [Jahra]. Line 2 (Blue Line): [National Stadium] - Salva - Great Mosque Route Length: 21 Total Stations: 27 Station Names: [National Stadium, Jleeb Al Shuyoukh, Farwaniya, 6th Ring Road, 360 Mall, New Ministries Area, Shuhada, H

PROJECTS: EPISODE 2 - HYDERABAD METRO RAIL LIMITED

Image
 HYDERABAD METRO RAIL LIMITED Hyderabad Metro is a mass rapid transit system in Telangana, India. Project Name: Hyderabad Metro Rail Project. Owner: Hyderabad Metro Rail Limited, Govt. of Telangana. Operator: L&T Metro Rail (Hyderabad) Limited. Project Type: Mass Rapid Transit System (MRTS) Planned Metro Rail Network: 188 km (7 Lines) Operational Network: 69.21 km Project Cost: INR 18,800 Crore (Phase-I) Funding Pattern: PPP Mode Start Date of Operation: 29 November 2017 Hyderabad Metro Phase I Major Contractors Larsen & Toubro (L&T):  Concessionaire for construction, operational & maintenance of Hyderabad Metro Phase I under PPP mode Thales Group: Supply of Signaling & CBTC Technology (Rs 740 crore) Hyundai Rotem: Supply of Rolling Stock 57 trains (171 cars). (Rs 1,800 crore) Line 1 (Red Line): Miyapur – LB Nagar (via Ameerpet) Route length: 29.21 km (Operational) Total Stations: 27 (All elevated) Stations: Miyapur, JNTU College, KPHB Colony, Kukatpally, Balanagar,