Posts

Showing posts from April 4, 2021

ENGINEERING LESSONS: EPISODE 21 DWARKA EXPRESSWAY GIRDER COLLAPSED

Image
EPISODE 21: REPORT ON DWARKA EXPRESSWAY GIRDER COLLAPSED  Dwarka Expressway way, Package 3 bridge collapse 28/03/2021 Contractor: LNT,   Engineer: AECOM, CEG Video:  https://www.youtube.com/watch?v=mKB4fr15IEI As per VK Raina Report: Inspection of the Collapsed Spans of decks of Dwarka Gurgaon Bridge one almost fully prestressed and the other ready on hooks about to be prestressed.  Its observed that the Concrete surface at the bottoms of 2 segments was  of very  poor quality and fully honey combed, which got progressively Crushed in a matter of a  minutes. The soffit commenced crushing, progressively reducing the effective compression  section  area that in turn commenced  folding (upwards) , cracking open the top of top slab in Flexural Tension and the speeding and continuous reduction of effective section progressively Crushed the soffit,  this 1st Plastic Hinge would  Rotate fast enough not allowing the 2nd distressed section to catch up to form its Hinge. The rest is history. In