PROJECTS : EPISODE 5 : PATNA METRO

  PATNA METRO


Project Name: Patna Metro Rail Project
Owner: Patna Metro Rail Corporation Limited, Govt. of Bihar
Project Type: Mass Rapid Transit System (MRTS)
Project Cost: INR 13,479 Crores
Network Length: 32.12 km
Funding Pattern: Govt. of India (20%), Govt. of Bihar (20%) and Loan from Foreign Institutions (60%)
Completion Target: 2023
Status: Under construction

Contract Awarded

  • DMRC Limited: General Consultancy
  • CEG Group: Geotechnical Investigation and Soil Testing Works
  • AECOM Singapore - AECOM India JV: Detailed Design Consultancy 
  • Systra MVA: Traction Consultancy
  • Civil Contracts

    • Package (PC 01): NCC Limited
    • Package (PC 02): Quality Buildcon Pvt. Ltd.

Patna Metro Rail Network

Corridor 1 (East-West): Danapur Cantonment - Khemni Chak

  • Length: 16.86 km (Elevated- 9.36 km, Underground- 7.5 km)
  • Total Stations: 14 (Elevated-8, Underground-6)
  • Station Names: Danapur Cantonment, Saguna More, RPS More, Patliputra, Rukanpura, Raja Bazar, Patna Zoo, Vikas Bhawan, Vidyut Bhawan, Patna Junction (interchange), Mithapur, Ramkrishna Nagar & Jaganpur and Khemni Chak.

Corridor 2 (North-South): Patna Railway Station - New ISBT

  • Length: 14.05 km (Elevated-6.0 km, Underground- 8.0 km)
  • Total Stations: 12 (Elevated- 5, Underground- 7)
  • Station Name: Patna Junction (interchange), Akashvani (formerly Dak Bungalow), Gandhi Maidan, PMCH, Patna University, Moin Ul Haq Stadium, Rajendra Nagar, Malahi Pakri, Khemni Chak, Bhoothnath, Zero Mile and New ISBT.
  • Depot: New ISBT


Popular posts from this blog

TECHNOLOGY : EPISODE 12 - FERRO CEMENT

ENGINEERING LESSONS - EPISODE 8 - DESIGN FORCES IN METRO BRIDGES