PROJECTS: EPISODE 3 - BANGALORE METRO RAIL CORPORATION LIMITED

  BANGALORE METRO RAIL CORPORATION LIMITED


Project Name: Bangalore Metro Rail Project (Namma Metro)
Operator: Bangalore Metro Rail Corporation Limited
Owner: Govt. of India and Govt. of Karnataka
Project Type: Mass Rapid Transit System (MRTS)
Status: Operational - October 20, 2011
Completion Target: 2023 (Phase-II)

Major Contractors

Namma Metro Phase II

  • IL&FS-ECC Ltd JV: Construction of Elevated Viaduct from Mysore Road station dead end to Pattanagere Station including 4 Nos of Elevated Metro Stations of East-West Corridor of Phase II. (Rs 326.99 Crore)
  • NCC Limited: Construction of Elevated Viaduct from Puttenahalli Cross station dead end to Anjanapura Township Station and further viaduct for Depot Lines including 5 Nos. of Elevated Metro Stations North-South Corridor of Phase II. (Rs 508.86 Crore)
  • Soma Enterprise Ltd: Construction of Elevated Viaduct from Pattanagere station to the beginning of Challagatta Depot including 2 Nos. of Metro Stations viz. Mailasandra Station and Kengeri station in the extension on the west side of East-West Corridor of Phase-2 (Rs 332.93 Crore)
  • HCC-URC JV: Construction of 6.4 km elevated Viaduct and Five Stations viz. Central Silk Board, BTM Layout, Jayadeva Hospital, Ragigudda and RV Road of Line 3. (Rs 797.29 Crore)
  • ITC Cementation: Construction of 12.798 km elevated viaduct and Eleven Stations viz. Bommasandra, Hebbagodi, Huskur Road, Electronic City-II, Electronic City-I, Hosa Road, Basapura Road, Chikkabegur, Munneshwara Nagar, Oxford College and HSR Layout of Line 3. (Rs 1,750 Crore)
  • CRRC Nanjing: For supplying 216 metro coaches (36 trains) for Phase II corridors. (Rs 1578.58 Crore)
  • Siemens India-Siemens AG JV: For providing CBTC Signaling Solution for Line-3. (Rs 250.90 Crore)

Bangalore Metro (Phase I)

Project Cost: INR 11,609 Crores | Total Length: 42.42 km | Stations: 41

Corridor 1 (Purple Line): Baiyyappanahalli - Mysore Road

  • Route Length: 18.22 km
  • No. of Stations: 17 (All operational)
  • Stations: Baiyyappanahalli, Swami Vivekananda Road, Indiranagar, Halasuru, Trinity, Mahatma Gandhi Road, Cubbon Park, Vidhana Soudha, Sir M. Visveshwaraya, Majestic, City Railway Station, Magadi Road, Hosahalli, Vijayanagar, Attiguppe, Deepanjali Nagar, Mysore Road.

Corridor 2 (Green Line): Nagasandra - Yelachenahalli

  • Route Length: 24.20 km
  • No. of Stations: 24 (All operational)
  • Stations: Nagasandra, Dasarahalli, Jalahalli, Peenya Industry, Peenya, Goraguntepalya, Yeshwanthpur, Sandal Soap Factory, Mahalakshmi, Rajajinagar, Kuvempu Road, Srirampura, Sampige Road, Majestic, Chickpet, Krishna Rajendra Market, National College, Lalbagh, Southend Circle, Jayanagar, Rashtriya Vidyalaya Road, Banashankari, Jayaprakash Nagar, Yelachenahalli

Bangalore Metro (Phase II)

Project Cost: INR 36,000 Crores | Total Length: 121.06 km | Stations: 77

Green Line Extension: Yelachenahalli - Anjanapura Township

  • Route Length: 6.29 km
  • Nos. of Stations: 5 (All elevated)
  • Station Names: Anjanapura Road Cross, Krishna Leela Park, Vajarahalli, Thalaghattapura, Anjanapura Township.
  • Status: Under construction

Green Line Extension: Hesarghatta Cross - BIEC

  • Route Length: 3.77 km
  • Nos. of Stations: 3 (All elevated)
  • Station Names: Manjunathanagar, Jindal and BIEC

Purple Line Extension: Baiyappanahalli - Whitefield

  • Route Length: 15.50 km
  • Nos. of Stations: 13 Stations
  • Station Names: Jyothipuram, K.R. Puram, Mahadevapura, Garudacharpalya, Doddanakundi Industrial Area, Visvesvaraya Industrial Area, Kundanahalli, Vydehi Hospital, Sri Satya Sai Hospital, ITPL, Kadugodi, Ujwala Vidyalaya and Whitefield

Purple Line Extension: Mysore Road – Challegatta near Kengeri

  • Rout Length: 8.81 km
  • Nos of Stations: 6 Stations
  • Station Names: Nayandahalli, Rajarajeshwari Nagar, Bangalore University, R. V. College of Engineering/Pattanagere, Mailasandra, Challegatta

Yellow Line: R V Road – Bommasandra via Electronic City

  • Rout Length: 18.82 km,
  • Nos of Stations: 16 Stations
  • Station Names: Rashtreeya Vidyalaya Road, Ragigudda, Jayadeva, BTM Layout, Silk Board junction, HSR Layout, Oxford College of Engineering, Muneshwara nagara, Chickka Begur, Basapura, Hosa Road, Electronic City-1, Electronic City-2, Huskur Road, Hebbagodi, Bommasandra

Pink Line: Gottigere–Nagawara

  • Rout Length: 22.87 km
  • Nos of Stations: 24 Stations
  • Station Names: 

Blue Line: Silk Board - KR Puram

  • Rout Length: 17 km
  • Nos of Station: 13 Stations
  • Station Names: Central Silk Board, Venkatapura, Agara Lake, Ibblur, Bellandur, Devarabeesanahalli, Kadubeesanahalli, Marathahalli, ISRO, Doddanekkundi, DRDO-Sports Complex, Saraswathi Nagar, KR Puram

Metro Rail Network (Phase III)

Namma Metro Airport Link (Krishnarajapuram - Kempegowda International Airport)

  • Project Cost: Rs 10,584 Crore
  • Route Length: 39.8 km
  • Total Stations: 17
  • Station Names: KR Puram, Kasturi Nagar, Horamavu, HRBR Layout, Kalyan Nagar HBR Layout, Nagawara (interchange Station), Veeranna Palya, Kempapura, Hebbal, Kodigehalli, Jakkur Cross, Yelahanka, Bagalur Cross, Bettahalasuru, Doddaljala, Airport City, KIA Terminals.