Posts

ENGINEERING LESSONS : EPISODE 18 WHALE CATCHES DUTCH METRO TRAIN BEFORE CRASHING IN WATER

Image
WHALE CATCHES DUTCH METRO TRAIN AFTER DEADLY CRASH  Date of the Incident:  2 November 2020 Place :  De Akkers station in Spijkenisse, Netherlands Metro train in Spijkenisse, near the city of Rotterdam, Netherlands crashed through a barrier at the end of the tracks. Instead of plummeting into the water below, the train was caught by a sculpture of a whale's tail.  Several meters above the ground, the train was left perched upon one of two tail fins. The sculpture was built around 20 years ago in a park underneath the raised metro  by artist Maarten Struijs , its name a deliberate play on the fact that it is a “tail track” at the end of the line. Experts said it was unclear why the train had not been stopped by automatic buffers at the end of the track. Apparently something went wrong technically, possibly combined with human error. Surprisingly the sculpture built of plastic have saved the train from falling down, even after 20 years the sculpture made of plastic was found  undeteri

PROJECTS : SURAT METRO

Image
 SURAT METRO Project Name: Surat Metro Rail Project Operator: Gujarat Metro Rail Corporation Limited Owner: Govt. of India and Govt. of Gujarat Project Type: Mass Rapid Transit System (MRTS) Project Cost: INR 12,114 Crores (Phase-I) External Funding Agency: AfD and KfW Total Network Length: 40.35 km Nos. of Corridors: 2 Status: Under-construction Contract Awarded Delhi Metro Rail Corporation:   DPR Consultant. Systra MVA Consulting:   Detailed design consultancy for Corridor-1 from Dream city to Majuragate Elevated Viaduct and Nine Elevated Metro-Rail Stations including Depot at Dream city. Corridor 1 (Red Line): Sarthana to Dream City Route Length: 21.61 km Stations: 20 Stations (Elevated -15.14 km, 14 Stations), Underground -6.47 km, 6 Stations) Station Names: Sarthana, Nature Park, Varachha Chopati, Kapodra Patiya, Laabheshwar Chowk, Central Warehouse, Surat, Maskati Hospital, Chowk Bazar, Majura Gate, Rupali Canal, Althan Tenament, Althan Gam, VIP Road, Women ITI, Bhimrad, Conventi

PROJECTS: EPISODE 1 - CHENNAI METRO RAIL LIMTED

Image
 CHENNAI METRO RAIL LIMTED Project Name: Chennai Metro Rail Project Owner: Govt. of India and Govt. of Tamilnadu Operator: Chennai Metro Rail Limited (CMRL) Project Type: Mass Rapid Transit System (MRTS) Project Cost: INR 20,000 Crore (Phase-I) Total Length: 54.1 km Funding Pattern: Govt. of Tamilnadu and Foreign Institution Completion Target: 2021 Phase-II: Future Expansion – 107.59 km Phase-I: Operational – 54.1 km  Major Contractors (Phase I) Delhi Metro Rail Corporation: Consultant for Detailed Project Report (DPR) Egis Rail SA, France: General Consultancy Soma Enterprise: For the construction of a 4.5 km long viaduct along the Inner Ring Road Larsen and Toubro (L&T): For contraction for Elevated viaducts and Koyambedu depot L&T-Alstom JV: For design and construction of track works Johnson-SJEC JV: For supply of lifts and escalators Siemens AG: For the power supply and overhead electrification Alstom: For supply of Rolling Stock Nippon Signal: For Automatic Fare Collection

PROJECTS: EPISODE 3 - BANGALORE METRO RAIL CORPORATION LIMITED

Image
  BANGALORE METRO RAIL CORPORATION LIMITED Project Name:  Bangalore Metro Rail Project (Namma Metro) Operator:  Bangalore Metro Rail Corporation Limited Owner: Govt. of India and Govt. of Karnataka Project Type:  Mass Rapid Transit System (MRTS) Status: Operational - October 20, 2011 Completion Target:  2023 (Phase-II) Major Contractors Namma Metro Phase II IL&FS-ECC Ltd JV:  Construction of Elevated Viaduct from Mysore Road station dead end to Pattanagere Station including 4 Nos of Elevated Metro Stations of East-West Corridor of Phase II.  (Rs 326.99 Crore) NCC Limited:  Construction of Elevated Viaduct from Puttenahalli Cross station dead end to Anjanapura Township Station and further viaduct for Depot Lines including 5 Nos. of Elevated Metro Stations North-South Corridor of Phase II.  (Rs 508.86 Crore) Soma Enterprise Ltd:  Construction of Elevated Viaduct from Pattanagere station to the beginning of Challagatta Depot including 2 Nos. of Metro Stations viz. Mailasandra Station

PROJECTS : EPISODE 5 : PATNA METRO

Image
  PATNA METRO Project Name: Patna Metro Rail Project Owner: Patna Metro Rail Corporation Limited, Govt. of Bihar Project Type: Mass Rapid Transit System (MRTS) Project Cost: INR 13,479 Crores Network Length: 32.12 km Funding Pattern: Govt. of India (20%), Govt. of Bihar (20%) and Loan from Foreign Institutions (60%) Completion Target: 2023 Status: Under construction Contract Awarded DMRC Limited:  General Consultancy CEG Group:  Geotechnical Investigation and Soil Testing Works AECOM Singapore - AECOM India JV:  Detailed Design Consultancy  Systra MVA:  Traction Consultancy Civil Contracts Package (PC 01):  NCC Limited Package (PC 02):  Quality Buildcon Pvt. Ltd. Patna Metro Rail Network Corridor 1 (East-West): Danapur Cantonment - Khemni Chak Length: 16.86 km (Elevated- 9.36 km, Underground- 7.5 km) Total Stations: 14 (Elevated-8, Underground-6) Station Names:  Danapur Cantonment, Saguna More, RPS More, Patliputra, Rukanpura, Raja Bazar, Patna Zoo, Vikas Bhawan, Vidyut Bhawa

PROJECTS : EPISODE 8 JAIPUR METRO

Image
 JAIPUR METRO Project Name: Jaipur Metro Rail Project Operator: Jaipur Metro Rail Corporation Limited (JMRC) Owner: Govt. of Rajasthan General Consultant: Delhi Metro Rail Corporation (DMRC) Project Type:  Mass Rapid Transit System (MRTS) Project Cost:  INR 9732.00 Crore Funding Agency: Jaipur Government Start Date of Operation: 3 June 2015 Major Contract Awarded Delhi Metro Rail Corporation (DMRC):  General Consultancy BEML Limited:  Contract for the supply of 10 nos. four-car train (Rolling Stock) Jaipur Metro Rail Network Operational Network:  12.0 km  | No. of Station:  11 Phase I: Mansarovar - Badi Chaupar (North-South Corridor) Route Length: 12.0 km Project Cost: INR 3,149 crore Stations: 11 Stations No. of Trains: 10 Operational Stations: Mansarovar, New Aatish Market, Vivek Vihar, Shyam Nagar, Ram Nagar, Civil Lines, Railway Station, Sindhi Camp, Chand Pole, Chhoti Chaupar, Badi Chaupar. Depot: Mansarovar Phase II: Sitapura Industrial Area - Ambabari (East-West Corridor) R

PROJECTS : EPISODE 7 KANPUR METRO

Image
  KANPUR METRO Project Name: Kanpur Metro Rail Project Owner:  Uttar Pradesh Metro Rail Corporation Limited Project Type:  Mass Rapid Transit System (MRTS) Project Cost:  INR 11,076 Crores Funding Pattern:  Govt. of India, Govt. of Uttar Pradesh and European Investment Bank (EIB) Completion Target:  2022 Major Contractors TYPSA-Italferr JV:  General Consultancy (Rs 260.62 Crore) Systra MVA Consulting:  Detailed Design Consultant (DDC) Afcons Infrastructure Limited:  Design and construction of elevated viaducts and 9 stations of priority corridor from IIT Kanpur to Moti Jhil (Rs 735 Crore). KSM Bashir Mohammad & Sons :  Construction of Metro Depot-cum-Workshop at Government Polytechnic (Rs 83.9 Crore). Bombardier Transportation:  Supply of Rolling Stock Coaches including Signaling System. Kanpur Metro Rail Network Line-1 (Priority Corridor): IIT Kanpur - Moti Jheel Project Cost: INR 11,076 crores Length: 8.7 km Total Stations: 9 (Elevated) Station Names:  IIT Kanpur, Kalyanpur R