PROJECTS : SURAT METRO

Image
 SURAT METRO Project Name: Surat Metro Rail Project Operator: Gujarat Metro Rail Corporation Limited Owner: Govt. of India and Govt. of Gujarat Project Type: Mass Rapid Transit System (MRTS) Project Cost: INR 12,114 Crores (Phase-I) External Funding Agency: AfD and KfW Total Network Length: 40.35 km Nos. of Corridors: 2 Status: Under-construction Contract Awarded Delhi Metro Rail Corporation:   DPR Consultant. Systra MVA Consulting:   Detailed design consultancy for Corridor-1 from Dream city to Majuragate Elevated Viaduct and Nine Elevated Metro-Rail Stations including Depot at Dream city. Corridor 1 (Red Line): Sarthana to Dream City Route Length: 21.61 km Stations: 20 Stations (Elevated -15.14 km, 14 Stations), Underground -6.47 km, 6 Stations) Station Names: Sarthana, Nature Park, Varachha Chopati, Kapodra Patiya, Laabheshwar Chowk, Central Warehouse, Surat, Maskati Hospital, Chowk Bazar, Majura Gate, Rupali Canal, Althan Tenament, Althan Gam, VIP Road, Women ITI...

PROJECTS: EPISODE 1 - CHENNAI METRO RAIL LIMTED

Image
 CHENNAI METRO RAIL LIMTED Project Name: Chennai Metro Rail Project Owner: Govt. of India and Govt. of Tamilnadu Operator: Chennai Metro Rail Limited (CMRL) Project Type: Mass Rapid Transit System (MRTS) Project Cost: INR 20,000 Crore (Phase-I) Total Length: 54.1 km Funding Pattern: Govt. of Tamilnadu and Foreign Institution Completion Target: 2021 Phase-II: Future Expansion – 107.59 km Phase-I: Operational – 54.1 km  Major Contractors (Phase I) Delhi Metro Rail Corporation: Consultant for Detailed Project Report (DPR) Egis Rail SA, France: General Consultancy Soma Enterprise: For the construction of a 4.5 km long viaduct along the Inner Ring Road Larsen and Toubro (L&T): For contraction for Elevated viaducts and Koyambedu depot L&T-Alstom JV: For design and construction of track works Johnson-SJEC JV: For supply of lifts and escalators Siemens AG: For the power supply and overhead electrification Alstom: For supply of Roll...

PROJECTS: EPISODE 3 - BANGALORE METRO RAIL CORPORATION LIMITED

Image
  BANGALORE METRO RAIL CORPORATION LIMITED Project Name:  Bangalore Metro Rail Project (Namma Metro) Operator:  Bangalore Metro Rail Corporation Limited Owner: Govt. of India and Govt. of Karnataka Project Type:  Mass Rapid Transit System (MRTS) Status: Operational - October 20, 2011 Completion Target:  2023 (Phase-II) Major Contractors Namma Metro Phase II IL&FS-ECC Ltd JV:  Construction of Elevated Viaduct from Mysore Road station dead end to Pattanagere Station including 4 Nos of Elevated Metro Stations of East-West Corridor of Phase II.  (Rs 326.99 Crore) NCC Limited:  Construction of Elevated Viaduct from Puttenahalli Cross station dead end to Anjanapura Township Station and further viaduct for Depot Lines including 5 Nos. of Elevated Metro Stations North-South Corridor of Phase II.  (Rs 508.86 Crore) Soma Enterprise Ltd:  Construction of Elevated Viaduct from Pattanagere station to the beginning of Challagatta Depot inclu...

PROJECTS : EPISODE 5 : PATNA METRO

Image
  PATNA METRO Project Name: Patna Metro Rail Project Owner: Patna Metro Rail Corporation Limited, Govt. of Bihar Project Type: Mass Rapid Transit System (MRTS) Project Cost: INR 13,479 Crores Network Length: 32.12 km Funding Pattern: Govt. of India (20%), Govt. of Bihar (20%) and Loan from Foreign Institutions (60%) Completion Target: 2023 Status: Under construction Contract Awarded DMRC Limited:  General Consultancy CEG Group:  Geotechnical Investigation and Soil Testing Works AECOM Singapore - AECOM India JV:  Detailed Design Consultancy  Systra MVA:  Traction Consultancy Civil Contracts Package (PC 01):  NCC Limited Package (PC 02):  Quality Buildcon Pvt. Ltd. Patna Metro Rail Network Corridor 1 (East-West): Danapur Cantonment - Khemni Chak Length: 16.86 km (Elevated- 9.36 km, Underground- 7.5 km) Total Stations: 14 (Elevated-8, Underground-6) Station Names:  Danapur Cantonment, Saguna More, RPS More, Patliputra, Rukanpura, ...

PROJECTS : EPISODE 8 JAIPUR METRO

Image
 JAIPUR METRO Project Name: Jaipur Metro Rail Project Operator: Jaipur Metro Rail Corporation Limited (JMRC) Owner: Govt. of Rajasthan General Consultant: Delhi Metro Rail Corporation (DMRC) Project Type:  Mass Rapid Transit System (MRTS) Project Cost:  INR 9732.00 Crore Funding Agency: Jaipur Government Start Date of Operation: 3 June 2015 Major Contract Awarded Delhi Metro Rail Corporation (DMRC):  General Consultancy BEML Limited:  Contract for the supply of 10 nos. four-car train (Rolling Stock) Jaipur Metro Rail Network Operational Network:  12.0 km  | No. of Station:  11 Phase I: Mansarovar - Badi Chaupar (North-South Corridor) Route Length: 12.0 km Project Cost: INR 3,149 crore Stations: 11 Stations No. of Trains: 10 Operational Stations: Mansarovar, New Aatish Market, Vivek Vihar, Shyam Nagar, Ram Nagar, Civil Lines, Railway Station, Sindhi Camp, Chand Pole, Chhoti Chaupar, Badi Chaupar. Depot: Mansarovar Phase II:...

PROJECTS : EPISODE 7 KANPUR METRO

Image
  KANPUR METRO Project Name: Kanpur Metro Rail Project Owner:  Uttar Pradesh Metro Rail Corporation Limited Project Type:  Mass Rapid Transit System (MRTS) Project Cost:  INR 11,076 Crores Funding Pattern:  Govt. of India, Govt. of Uttar Pradesh and European Investment Bank (EIB) Completion Target:  2022 Major Contractors TYPSA-Italferr JV:  General Consultancy (Rs 260.62 Crore) Systra MVA Consulting:  Detailed Design Consultant (DDC) Afcons Infrastructure Limited:  Design and construction of elevated viaducts and 9 stations of priority corridor from IIT Kanpur to Moti Jhil (Rs 735 Crore). KSM Bashir Mohammad & Sons :  Construction of Metro Depot-cum-Workshop at Government Polytechnic (Rs 83.9 Crore). Bombardier Transportation:  Supply of Rolling Stock Coaches including Signaling System. Kanpur Metro Rail Network Line-1 (Priority Corridor): IIT Kanpur - Moti Jheel Project Cost: INR 11,076 crores Length:...

PROJECTS : EPISODE 6 NOIDA METRO

Image
 NOIDA METRO Project Name:  Noida Metro Rail Project Operator:  Noida Metro Rail Corporation Limited Owner:  Govt. of India and Govt. of Uttar Pradesh Project Type:  Mass Rapid Transit System (MRTS) Project Cost: INR 5,503 Crore (Phase-I) Total Planned Metro Network: 70 km Operational Network: 29.7 km (1 Line, 22 Stations) Noida Metro Rail Network (Phase I) Line 1 (Aqua Line): Noida City Centre - Depot Station Project Cost: Rs 5503 Crore Route Length: 29.707 km (Operational) Total Stations: 22 (All elevated) Station Names: Noida City Centre, Sector-71, Sector-50, Sector-78, Sector-101, Sector-81, Dadri Road, Sector-83, Sector-137, Sector-142, Sector-143, Sector-144, Sector-147, Sector-153, Sector-146, Sector-149, Knowledge Park-II, Knowledge Park-I, Pari Chowk, Alpha-I, Alpha-II, Delta-I, Depot. Interchange Stations: Noida City Centre (Delhi Metro's Blue Line) Status: Operational Noida Metro Rail Network (Phase II) Line 1 Extension (Aqua Line): Noida Se...